SYSTEM STATISTICS - FOR 06/02/2025 ,Thursday

Ambient temperature at Kochi at 15 hrs in deg C  -  32

GENERATION - HYDEL

Station

Day's Generation

Monthly Cum

Daily Avg.

Maximum Demand

Shutdown

Availability of m/c's

 

mu

mu

mu

MW

Time

Planned

Forced

Avble

MP

EP

Idukki

4.602

33.634

5.6057

622

18

6

6

6

Sabarigiri

1.975

16.2705

2.7118

275

19

1

5

5

5

Idamalayar

0.9955

6.3059

1.051

68.2

7

2

2

2

Sholayar

0.545

4.357

0.7262

54.4

19

3

3

3

Pallivasal

0.0974

0.9548

0.1591

16

18

2

4

2

4

Group I Total

8.2149

63.5992

10.5999

Kuttiadi

1.1775

8.8694

1.4782

188

7

1

5

5

5

Panniar

0.2977

2.2618

0.377

16.2

1

1

1

1

GroupII Total

1.4752

11.1312

1.8552

Neriamangalam

0.4798

3.177

0.5295

60.8

20

1

3

2

3

Lower Periyar

0.387

3.431

0.5718

146

19

3

3

Poringalkuthu, PLBE

0.3538

2.2291

0.3715

42.96

19

2

4

4

4

Sengulam

0.3242

1.8305

0.3051

50.6

19

4

2

4

Kakkad

0.3187

2.4277

0.4046

35.92

18

2

1

2

Kallada

0.2486

1.4817

0.247

15.4

4

2

2

2

Malankara

0.0843

0.4962

0.0827

4.65

2

1

2

2

1

Sum: Small Hydels

0.2364

1.4362

0.2394

Group III Total

2.4795

16.6411

2.7735

CAPTIVE

Maniyar

0.0099

0.1051

0.0175

3

Kuthungal

0.1385

0.0231

3

Hydel Total

12.1795

91.6151

15.2692

THERMAL

THERMAL BDPP

3

KDPP

1

Thermal Total

0

0

0

WIND

WIND Kanjikode

0.0176

0.1444

0.0241

IPP

SOLAR KSEBL

0.0302

0.2124

0.0354

IPPs

1.2061

8.3948

1.3991

HYDEL(Contd..) Thottiyar

0.0467

0.1317

0.022

2

1

PES-Pallivasal

2.077

0.3462

2

2

2

IPP Kayamkulam

Sum: Small Hydels

0.0832

0.6279

0.1046

MPS Steel+PCBL

0.2321

1.4694

0.2449

Sum: Wind mills

0.4589

1.424

0.2373

IPP Total

1.9803

11.916

1.986

Internal Generation

14.2076

103.8879

17.3147

IMPORT 400KV MDKA

7.673

44.203

7.3672

400KV PKKD

7.618

45.985

842

50.08

400KV KOCHI+KOTTAYAM

15.495

86.607

14.4345

3964

50.07

400KV KOZHKOD

14.367

86.166

1531

50.11

400KV NORTH TRSR

5.9333

35.3368

5.8895

4494

50.01

400KV TVM

9.483

54.185

1318

50.05

220KV_KNPA+SBGR +PVUD+EDMN

12.236

69.9324

11.6554

3560

50.15

110KV_MJSM +PRSLA

0.6757

4.4258

Net Import

73.481

426.8409

71.1402

Consumption

87.6886

530.7289

88.4548

66

50.07

Deviation Account

3159

50.12

Import (mu)

1.261

8.297

1.3828

196

49.98

Export (mu)

0.263

1.164

0.194

3082

50.18

Avg Import Rate (Rs/kWh)

Avg Export Rate (Rs/kWh)

50.18

0.39

Import amount (Rs lakhs)

49.94

0.81

Export Amount (Rslakhs)

50.05

Net Import (on UI) (mu)

0.998

7.133

1.1888

Net amount payable (Rs lakhs)

3633

220

211

CGS AVAILABILITY

33.0505

202.9839

33.8307

50.06

227

210

Adl Share(-) / surrender(+)

1.1168

2.4781

0.413

7

226

216

other open acess(+exp)

-0.2945

-2.1815

-0.3636

411

397

SR / ER Loss

1.2198

7.6313

1.2719

4509

222

215

Interstate Purch/Sale(+/-ve)

41.5239

224.5013

37.4169

50.02

224

217

Net Schedule

72.5322

420.2294

70.0382

19

224

216

R E C O R D S

229

220

For the month

90.829

3637

3

4520

3

4192.6207

229

222

All time

115.9485

4515

3

5797

2

5110.5708

224

217

Cumulative figures in mu

For the month

103.8879

530.7289

18.18

420.2294

6.6115

For the Financial Year

7290.4086

26621.2394

6850.77

19045.2126

285.6182